Panoramic Resources | Savannah Nickel Mine | Kimberly Ranges, WA
The Issue This underground mine, 250km inland from Kununarra, relied on two pipelines to efficiently transport slurry and tailings from the foot of the mine
The Issue This underground mine, 250km inland from Kununarra, relied on two pipelines to efficiently transport slurry and tailings from the foot of the mine
The Issue A DN200 x 7.5km sewer pipe in the Adelaide Hills a build-up of debris in the internal bore reducing functionality and flows. The
The Issue Solomon Water invited Clearflow Australia to participate in a competitive tender for the initial cleaning of 6 out of 30 fresh water bores
The Issue The build-up of hardened cement deposits, wastewater sludge and repeated blockages in vital extraction pipelines were causing costly shutdowns and down time for
The Issue TasWater contacted Clearflow to scope the removal of slime-type bio-film from the internal bores of water reticulation system pipelines. The Solution Clearflow advised
The Issue Tasmanian Irrigation contracted Clearflow Australia to pig a 600 – 500mm DICL pipeline to remove the build up of iron and manganese slimes
The Issue A number of Tasmanian towns were on boiled water alerts – meaning the build-up of biofilms and other contaminants was so high it
The Issue The Shire had ongoing problems with water quality and odour due to naturally occurring higher than normal deposits of manganese and iron in
The Issue Toowoomba Regional Council recently had biological growth in a trunk main causing high chlorine demand on the water within the main. Flushing and
The Issue The Council has adopted a preventative maintenance programme with Clearflow Australia. The Solution Water mains are cleaned using pipeline scouring and pigging, with
The Issue UGL-Kaefer is contracted to the Longford Gas Plant facility in Gippsland, Victoria. Clearflow was contracted by UGL-Kaefer to pig the heater tubes of