Byron Shire had a major water leak in the main reservoir in the town of Mullumbimby. We did not want to dump any water and did not want an internal entry if it could be avoided. I contacted Clearflow Australia to see if they could assist. After the initial inspection Clearflow were confident in solving the problem and proceeded with the repairs. It took three visits to the site; the first two ensuring the leak had at least slowed, and the third and final visit to seal completely the problem area. Clearflow's procedures were well thought out and executed. They avoided internal entry, removing risk of contamination whilst covering all O H & S issues safely, all resulting in a successful operation.
Full case studies on each of these projects are available. Please enter your details below if you'd like a copy.