The Issue
A DN200 x 7.5km sewer pipe in the Adelaide Hills a build-up of debris in the internal bore reducing functionality and flows.
The Solution
High efficiency ‘jetting pigs’ were used to create turbulence, to prevent compaction and clear debris from the pipe. State of the art pig location and tracking equipment monitored the location and progression of the pig. After two runs pumping efficiencies were returned to peak levels.
Full case studies on each of these projects are available. Please enter your details below if you'd like a copy.